The Westgate Centre
Project background
SOLUTION
The Bellsure solution
“Using our experience and knowledge, we offered a variety of products that suited the specific elements of the brief, supplying CAD designs and .dwg files to build into the client’s BIM model, including a CAD file that specified materials along with our recommendations, panel details and security fixings.
The finished shelter is a powder coated steel frame clad with aluminium Louvre panels. We used aluminium Neatdek self-supporting flooring and a specialist Kalzip standing seam roof. We then used our Double Decker Classic cycle racks as the chosen cycle storage for this project.”

The result
Conforming to all site regulations, we erected the shelter within 5 days – the tight timeframe being due to the imminent opening of the shopping centre. Our installers worked alongside the site manager to ensure a smooth and snag-free handover – complete with an enhanced operations & maintenance manual.