27-30 Avonmouth Way

Bespoke, aluminium cycle shelters & a vehicle wash shelter designed and installed for industrial units.

LOCATION

Bristol

CONTRACTOR

Magrock

ARCHITECT

Roberts Limbrick Ltd

The challenge

We worked closely with our client to put forward an alternative proposal to the architect’s original design. Having covered the basic requirements that these bike shelters must meet, including the number of cycle spaces, the aluminium fascia with the perforated holes, and the RAL colours, our design team put together concept drawings which incorporated these spec requirements. Our CAD team also put together a design led Vehicle Wash Station that was required for one of the industrial units, and after multiple revisions, we produced a 2-bay car wash station, specific to the clients needs. We then submitted the initial designs for approval by the client.

Project background

The project at Access 18 Avonmouth (Unit 28, 27–30 Avonmouth Way) is part of a major logistics and industrial development by St. Modwen Logistics, providing modern, flexible warehouse space for distribution occupiers within a wider scheme of over 1 million sq ft; the site is designed as a high-quality business park with landscaping, staff amenities, and strong transport links to support logistics operations.

SOLUTION

The Bellsure solution

Bellsure was considered as the best fit to oversee the completion of the Cycle Shelters and the Vehicle Wash Station on this project, given that our design matched the expectations of what the client was looking to achieve.

The result

Our install team completed the final step of the process, delivering high quality products that were designed and manufactured exactly to the clients requirements whilst remaining within budget.

Products used

Bellsure Supplies Limited recently supplied and installed bike shelters at our Access 18 scheme in Avonmouth, and we were very impressed with their service. From start to finish, the team was professional, efficient, and easy to work with. The quality of the shelters and the standard of installation were excellent, and the project was completed smoothly and on schedule. Overall, a reliable company that delivered exactly what was required to a high standard.”

Ellis Driver | Senior Project Surveyor - Magrock