Cambridge Road Estate
Project background
SOLUTION
The Bellsure solution
Bellsure delivered 380nr Cycle Spaces, through a mix of;
- Two-Tier Racks
- Semi-Vertical Racks
- Vertical Racks
- Sheffield Stands
In addition, we installed over 85 linear metres of Bellsure’s CuvaMesh 358 Security Mesh system.

The result
This project has enhanced the public realm, safe walking and cycling routes, and community facilities as part of the transformation from a deprived post‑war estate into a brighter, better-connected neighbourhood.
By supplying secure mesh enclosures and heavy‑duty cycle racks, we have directly supported this transformation. And this well‑designed cycle storage infrastructure has helped embed active travel into the scheme’s fabric, increased overall security of the estate’s communal spaces and added tangible value to the end‑user experience for incoming residents.
The net effect is a safer, more accessible environment that reinforces the developer’s and the borough’s commitment to sustainability, healthy living, and provision of high-quality amenities.














